Follow us :

Specializing in the production of Box girder steel structure welding connectors with good bearing capacity

Specializing in the production of Box girder steel structure welding connectors with good bearing capacity
Specializing in the production of Box girder steel structure welding connectors with good bearing capacitySpecializing in the production of Box girder steel structure welding connectors with good bearing capacitySpecializing in the production of Box girder steel structure welding connectors with good bearing capacitySpecializing in the production of Box girder steel structure welding connectors with good bearing capacitySpecializing in the production of Box girder steel structure welding connectors with good bearing capacity
group name
Steel structure parts
Min Order
1 piece
brand name
FXGTSS
model
GTG-W40
Nearest port for product export
Dalian, China
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FCA
Acceptable payment methods
T/T, L/C, Westem Union, Cash
update time
Wed, 21 Apr 2021 15:37:24 GMT

Paramtents

  • Material Q355B

  • Specification Customized

Packging & Delivery

  • Min Order1 piece

Briefing

The steel structure of box girder is a processing part of steel structure connecting buildings.

Detailed

Product name
Box girder steel structure
Brand name
Dalian Guangtong Steel Structure Co., Ltd. FXGTSS
Material
Q355B
Specification (length, width, height)

7370*1600*500

Surface treatment
Sandblasting, rust removal, Sad3
Antiseptic treatment
Paint epoxy primer, polyurethane topcoat
Coating thickness

>65μm    >100μm

Use
1. Steel structure flyover connected to the building.
2. On a bridge with a large span.
3. Expressway overpass and modern light rail transit elevated structure.
Feature
1. The steel has high tensile strength, compression resistance, high shear strength, light weight and large spanning capacity.
2. Uniform material, safe and reliable.
3. The quality is reliable and easy to transport.
4. Good ductility and ductility, which can improve seismic performance.
5. Long life, easy to repair and replace.
Installation method
Welding, bolted installation
Delivery time
10 tons: 15-20 days
11 tons - 50 tons: 25-40 days
Payment method
TT,T/T