Follow us :

Specializing in the production of environmental protection and energy saving air conditioning unit assembly Boom

Specializing in the production of environmental protection and energy saving air conditioning unit assembly Boom
Specializing in the production of environmental protection and energy saving air conditioning unit assembly BoomSpecializing in the production of environmental protection and energy saving air conditioning unit assembly BoomSpecializing in the production of environmental protection and energy saving air conditioning unit assembly BoomSpecializing in the production of environmental protection and energy saving air conditioning unit assembly BoomSpecializing in the production of environmental protection and energy saving air conditioning unit assembly Boom
group name
Steel structure parts
Min Order
1 piece
brand name
FXGTSS
model
FXGTSS-097
Nearest port for product export
Dalian, China
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FCA
Acceptable payment methods
T/T, L/C, Westem Union, Cash
update time
Sat, 08 May 2021 11:01:25 GMT

Paramtents

  • Material Q355B

  • Specification Customized

Packging & Delivery

  • Min Order1 piece

Briefing

Air conditioning unit assembly of coke oven equipment parts.

Detailed

Product name
Boom
Brand
Dalian Guangtong Steel Structure Co., Ltd. FXGTSS
Material
Q355B
Specification
Customized
Surface treatment
Sand blasting and rust removal sa2.5-sa3
Antiseptic treatment
Paint epoxy primer, polyurethane topcoat
Use
It is applied to the air conditioning unit assembly of equipment parts of coke oven in the power industry.
Features
1. The welding seam is full, and there is no air hole in the welding, which is firm and reliable.
2. Quality assurance, long service life.
3. Excellent material, corrosion resistance and durability.
4. High hardness, durable, wear-resistant, uniform material.
5. Environmental protection and energy saving, large air volume and advanced equipment.
Installation method
Welding, bolt connection and installation
Delivery time
10 tons: 15-20 days;
11-50 tons: 35-50 days
Payment method
TT,T/T