How is the entry and acceptance of steel component raw materials?

Mobilization and acceptance of raw materials for steel members: in recent years, in the whole process of the rapid development trend of China's construction industry, the total number of capital construction and project scale of steel structure engineering are constantly developing, so the total number of engineering construction risk malignant events is also increasing, causing serious harm to the construction safety of steel structure engineering and even the whole engineering construction site. Next, Guangtong steel structure will take steel structure workshop as the goal, analyze and summarize various risk sources that are often encountered in the whole process of steel structure workshop construction, in addition, analyze and discuss the safety precautions of risk sources. Mobilization and acceptance of raw materials for steel members: 
          
1. After the steel members are transported to the site and the goods are loaded and unloaded on the site, they will be piled up at a specific location in a specific temporary stacking yard. 
           
2. The transportation and mobilization of steel members and their raw materials shall be allocated according to the installation schedule. The mobilization of steel members and materials shall be carried out at least one or two days before the hoisting of each component determined according to the scheme. The components that must be assembled on site shall be mobilized one week in advance for component inspection and completion acceptance. For the mobilization of components and raw materials, it is necessary to take into account the limitation of the stacking yard where the installation is carried out, make full use of the connection between the installation site and the production, processing and production, and ensure that the installation work is carried out in an orderly manner. 
           
3. After the components are on the site, check whether the total number and serial number of the components are in accordance with the following freight logistics details, and whether the components are supporting facilities. If any problem is found, inform the manufacturer to quickly take effective measures, dismantle, replace or fill the components, so as to ensure that the core is urgent on the site. 
           
4. Strictly implement the relevant regulations and standards of engineering drawings, carry out acceptance inspection on the quality of components, and make a record. 
           
5. The manufacturing enterprise shall carry out maintenance before installation for the components manufactured beyond the standard and damaged during transportation. However, for slight damage, the installation enterprise can also carry out on-site renovation. 

Dalian Guangtong Steel Structure Co., Ltd., founded in 1998, is located in Dalian Free Trade Zone. Specializing in steel structure and non-standard metal parts design and manufacturing. The company covers an area of 18000 square meters, including 13000 square meters of plant area, with an annual output of more than 200 million tons. The company has dozens of advanced processing and testing equipment. Dalian Guangtong Steel Structure Co., Ltd. takes the credit management concept of "customer first, keep improving", takes "high quality" as the first criterion, takes quality as the embodiment of reputation, builds brand with quality, and achieves real high quality development!