What construction preparations should be made before building the workshop steel structure ?

Nowadays, workshop steel structure has been widely used, which has the advantages of light weight, high strength, good overall steel, environmental protection and energy saving, convenient construction, recyclable and so on. If the workshop steel structure is to be built quickly and well, preliminary construction preparation should be carried out.
Firstly, the drawings shall be reviewed before construction, and the construction scheme shall be determined and signed by the representatives of both parties. Understand the construction site, master the construction conditions, improve the water, electricity, gas safety, environmental noise, material stacking site and embedded parts infrastructure. Ensure the procurement plan and relevant time schedule of construction materials, carry out certain base metal inspection materials, and attach the factory certificate sealed by the original quality report unit and qualified building material inspection report. Select auxiliary materials such as bolts, prepare material list and strictly control building materials. The quality and bearing capacity of the equipment (such as cranes, ropes and cables) required in the construction process should also be strictly checked to avoid potential safety hazards.
Strengthen the management of the construction team, ensure that the construction unit has the corresponding construction qualification, and ensure that the staff have the operation certificate. Must carry out pre job technical training and safety training. In order to ensure the technical requirements of welding technical specifications, lifting requirements, and other technical specifications of steel structure, construction technical specifications, strictly control the technical quality, and ensure the minimum size error of steel skeleton, the smooth completion of steel structure construction in the workshop can be ensured.
The processing area and material stacking yard should be reasonably arranged according to the site conditions, so as to ensure that the site is flat and reasonably arranged, and ensure rain proof, anti-collision, etc. Safety supervision should be done well in the construction, and anti-corrosion and anti rust measures should be taken for the steel skeleton of the workshop steel structure.
The customized workshop steel structure of Dalian Guangtong Steel Structure Co., Ltd. The seismic strength can reach grade 7. It can be used in warehouse, residence, comprehensive house and construction site. The installation method is site hoisting, assembly, welding and bolt connection. It has the advantages of large span, high strength, light weight, heat preservation and energy saving, short construction time, good heat preservation effect, long service life, space saving and flexible layout. In the construction steel structure project, the company is also committed to the development of products and machining, non-standard welding parts and equipment, such as: dock fender, equipment rack, coke oven, wind proof equipment, sewage treatment equipment, etc., and sold to Europe, America, Africa, Southeast Asia and other international markets. With green environmental protection, safety and efficiency, quality first as the architectural concept, the company has become a large comprehensive steel structure enterprise integrating steel structure processing, mechanical processing, equipment, installation and maintenance.!