What is the production preparation for FXGTSS steel structure processing?

  Dalian Guangtong Steel Structure Co., Ltd. is a company specializing in the design and manufacture of steel structure products and non-standard metal parts. The company advocates safety first, quality first and green production. The company has dozens of advanced processing and testing equipment. More than 100 employees, more than three-quarters of whom are skilled workers. The following is the specific content of production preparation before steel structure processing and manufacturing:

1. Before fabrication of steel structure, self-examination and joint review shall be carried out to be familiar with design drawings, and process preparation for each process shall be done in accordance with process procedures. The materials, machines, tools and process equipment required for production and manufacturing shall conform to the process specification. The operators on duty shall be trained and assessed, and they can only work with certificates after they are qualified.

2. The quality inspector shall inspect the quality appearance and quality certification documents of the materials on site according to the relevant national standards, and fill in the material inspection record after the inspection is qualified. Mark the qualified materials or packing boxes.

3. When the materials enter the site, the re inspection shall be carried out according to the requirements of the project and the specific conditions of the material quality. If necessary, the flaw detection shall be carried out. The materials passing the re inspection and identification can be formally put into the warehouse, and the re inspection mark shall be made.

4. Selection and management of welding materials: according to the component materials provided in the design drawings, the management leader shall select the matching welding materials, and the welding process can be used only after the approval of the welding process qualification results. The welding material warehouse shall be set up with drying facilities according to the specifications, and shall be equipped with resident inspectors and custodians. When the welding material is out of the warehouse, the management regulations of the company shall be strictly followed and the ex warehouse procedures shall be performed.

  Since the establishment of the company, Dalian Guangtong Steel Structure Co., Ltd. has always adhered to the concept of "integrity and pragmatism, innovation and win-win, and the pursuit of excellence". Through the new management mode, we try our best to provide customers with satisfactory products and thoughtful services with a serious and responsible attitude.