Follow us :

Professional design and construction of workshop steel structure, create excellent project

Professional design and construction of workshop steel structure, create excellent project
Professional design and construction of workshop steel structure, create excellent projectProfessional design and construction of workshop steel structure, create excellent projectProfessional design and construction of workshop steel structure, create excellent projectProfessional design and construction of workshop steel structure, create excellent projectProfessional design and construction of workshop steel structure, create excellent project
group name
Steel structure workshop
Min Order
1 piece
brand name
FXGTSS
model
FXGTSS-013
Nearest port for product export
Dalian, China
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FCA
Acceptable payment methods
T/T, L/C, Westem Union, Cash
update time
Tue, 12 Jan 2021 14:02:43 GMT

Paramtents

  • Brand FXGTSS

  • Specification Customized

Packging & Delivery

  • Min Order1 piece

Briefing

The workshop steel structure is constructed by welding, assembling and assembling steel.

Detailed

Product Name
Workshop steel structure
Brand
Dalian guangtong steel structure co., LTD. FXGTSS
Material
Q355B
Specification
Customized
Roof load value

1.0KN/m²

Shockproof intensity
Level 7
Surface Treatment
Sand blasting, rust removal Sad3, 2 times alkyd anti-rust paint
Antiseptic Treatment
Paint epoxy primer, polyurethane finish
Coating Thickness

>65μm     >100μm

Use
As factories, warehouses, restaurants, hotels, stores, logistics storage, office buildings, stadiums, hangars and other places. It is suitable for single-layer large-span workshop steel structure, and can also be used to build multi-storey or high-rise buildings.
Characteristic
1. The workshop steel structure has high strength, large span, anti-seismic and wind resistance.2. Seal; Fire prevention; Good corrosion resistance, good shock resistance, durable, easy to maintain.3. Beautiful and durable, steel structure building lines simple and smooth, with a modern sense.4. Environmental protection and energy saving, recyclable.
 Installation Mode
Site hoisting assembly, bolt connection and installation
Delivery Time
10 tons: 15-20 days;
11-50 tons: 35-50 days
Payment Method
TT,T/T