Follow us :

New energy saving, environmental protection and high efficiency coke oven equipment Dust removal and coke blocking car

New energy saving, environmental protection and high efficiency coke oven equipment Dust removal and coke blocking car
New energy saving, environmental protection and high efficiency coke oven equipment Dust removal and coke blocking carNew energy saving, environmental protection and high efficiency coke oven equipment Dust removal and coke blocking carNew energy saving, environmental protection and high efficiency coke oven equipment Dust removal and coke blocking car
group name
Coke oven
Min Order
1 piece
brand name
FXGTSS
model
DSD-4.3M-6M-2
Nearest port for product export
Dalian, China
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FCA
Acceptable payment methods
T/T, L/C, Westem Union, Cash
update time
Thu, 27 May 2021 15:19:24 GMT

Paramtents

  • Brand FXGTSS

  • Material Q235B

Packging & Delivery

  • Min Order1 piece

Briefing

The supporting equipment of large coke oven is the main special mechanical equipment for coke oven in coking production.

Detailed

Product name
Dust removal and coke blocking car
Brand
Dalian Guangtong Steel Structure Co., Ltd. FXGTSS
Material
Q235B
Specification
Custom made
Surface treatment
Sandblasting, rust removal, Sad3
Antiseptic treatment
Paint epoxy primer, polyurethane topcoat
Coating thickness
>65μm />100μm
Use
The mature coke is introduced into the quenching car by the push-focus car through the dust-collecting and focusing car guide grille. It must have the function of automatically cleaning the furnace door and the furnace frame, and is equipped with a complete dust-removing device.
Dust removal and coke blocking vehicles are widely used in large-scale construction machinery and equipment in mines, thermal power plants and ports.
Characteristics
1. High efficiency and large capacity.
2. Advanced process design, practical, reliable and low cost.
3. Quality assurance and safe operation.
4. Good sealing, dust removal,
5. It has the functions of manipulating the riser water seal cover and the bridge water seal valve and vacuuming and cleaning the top surface of the furnace.
Installation method
On-site lifting assembly, bolted installation
Delivery time
20-50 tons: 35-50 days;
51 tons - 180 tons: 50-60 days
Payment method
TT,T/T